RNR: Projects
![](https://rnr-construction.com/wp-content/uploads/2018/02/Photo-Aug-13-2-05-41-PM-e1518125220453.jpg)
Wheatland Gate Design-Build Bridges, Beale AFB
CLIENT: | Department of Defense, USAF |
---|---|
PRIME CONTRACTOR: | R N R Construction, Inc. |
LOCATION: | Beale Air Force Base |
DATE: | November 2017 |
DESCRIPTION: | R N R designed and built two bridges to replace substandard existing bridges condemned after Federal inspection. The two bridges were both cast-in-place abutments and precast superstructure topped with a cast-in-place bridge deck. |
---|