DNB: Projects

Upper Blackwelder Dam Design-Build Repair
CLIENT: | Department of Defense, USAF |
---|---|
PRIME CONTRACTOR: | D N B Infrastructure, Inc. |
LOCATION: | Beale Air Force Base |
DATE: |
DESCRIPTION: | D N B designed and built left and right spillways in order to repair a significant sink hole and seen failure. The project consisted of inlet and outlet structures with concrete channels and rip rap protection, along with culverts with cutoff keys and a reinforced box culvert. |
---|