DNB: Projects
Morton Road Emergency Road Repair at Canyon Creek
CLIENT: | County of Placer |
---|---|
PRIME CONTRACTOR: | D N B Infrastructure, Inc. |
LOCATION: | Alta, CA |
DATE: | August 2018 |
DESCRIPTION: | D N B removed and replaced a precast slab bridge and road approaches after intense rains washed the existing roadway out. Work included grading, paving, and placing of erosion control and rock slope protection. The work was performed in 40 working days. |
---|