Blue Oaks Blvd Bridge over Kaseburg Creek
CLIENT: |
Signature Homes, Inc. |
PRIME CONTRACTOR: |
R N R Construction, Inc. |
LOCATION: |
Roseville, CA |
DATE: |
September 2011 |
DESCRIPTION: |
Design-Build of a 3 span cast-in-place prestressed slab bridge founded on pile extensions reaching 42 feet in width by 120 feet in length. R N R’s cast-in-place structure construction occurred on time and within the contract in accordance with the contract technical specifications. R N R also successfully achieved the client’s quality control and quality assurance goals and measures.
|
|
A major challenge on this project was the communication lacking between various agencies involved in quality assurance for this project. Valuable time was lost, due to no fault of R N R, because administrative matters were not appropriately addressed in a timely manner. R N R successfully overcame these obstacles by increasing communication efforts and project planning while encouraging multi-agency participation and involvement.
|
"2012 Project of the Year"
– American Public Works Association